Home / Applications / Oil and Gas
Atlas SSCV for Oil & Gas
Severe service control valve engineered for upstream and midstream operations. High-pressure blowdown, corrosive fluids, NACE-compliant construction.
Challenges in Oil & Gas Flow Control
Oil and gas operations push conventional control valves beyond their design limits every day.
High-Pressure Blowdown
Wellhead and separator blowdown service involves extreme pressure drops that cause catastrophic cavitation in conventional globe valves, destroying trim in months.
Corrosive & Erosive Fluids
Produced fluids containing H2S, CO2, sand, and brines attack valve internals. Combined with cavitation, material degradation accelerates dramatically.
HSE & Noise Compliance
OSHA noise limits, API and NACE standards, and increasing safety regulations demand valves that perform reliably under the harshest conditions.
How the Atlas SSCV Solves These Problems
The Atlas SSCV’s axisymmetric flow technology eliminates the root cause of valve failure in oil & gas service: asymmetric pressure drop that creates cavitation.
Zero Cavitation at 6,000 PSI
Uniform 360-degree pressure dissipation prevents vapor bubble formation even at extreme pressure ratios. Trim stays pristine for 10+ years.
Noise Below 60 dB
Whisper-quiet operation eliminates the need for acoustic enclosures and ensures OSHA compliance without additional mitigation measures.
NACE MR0175 Compliant
Available in corrosion-resistant alloys including Duplex, Alloy 20, and Hastelloy for sour service and corrosive environments.
Proven in the Field
An Atlas SSCV installed on a high-pressure separator blowdown application in the Gulf Coast region has been operating continuously for over 10 years. Inspection of internal trim shows zero cavitation damage—compared to the previous globe valve that required trim replacement every 8 months.
10+
Years in Service
$0
Trim Replacement Cost
Ready to Eliminate Valve Failures in Your Operation?
Send us your operating data and our engineering team will provide a custom Atlas SSCV recommendation within 48 hours.
